Applications
- The calendar function allows user to program the PLC procedure, the ON/OFF in chronological order, the daylight saving time and etc.
- A wide range of models (0.75~400KW) to fulfill the demands of different industries.
- The modularized design eases the maintenance and expansion.
- Long-life design and self diagnosis for key components.
- Special PCB coating design (Printed Circuit Board) for enhancing environmental tolerance.
- Complied with global safety standards: CE, UL and cUL
- Standard LCD model (IP20/NEMA1) with built-in PLC to support up to 10K steps